Deposit
Custom cedar material deposit
$2,500.00
Job-specific cedar delivered to the client and retained after closeout.
Demo Demo — sample data, nothing is saved.
Exit demoContractor preview · not the client workspace
Review exactly what the client will see before opening the fictional authorization walkthrough.
Preview only — no invitation, authorization request, payment instruction, or notification is sent.
Prepared by
Maya Lopez · Owner
Residential remodeling
Austin and nearby suburbs
TX demo license DEMO-1842
General liability on file
Base job scope
Cedar was delivered and stayed with the client. Installation money was returned after a utility easement blocked the fence route.
$9,500.00
Estimated start
2026-06-07
Estimated completion
2026-06-16
Deposit
$2,500.00
Job-specific cedar delivered to the client and retained after closeout.
Work phase 1
$4,000.00
Set the fence line first. Post excavation stays on hold until the complete route is cleared. The later easement conflict stopped the job before any post hole or hand excavation began.
Work phase 2
$3,000.00
Future uncollected installation and cleanup cancelled at contractor closeout.
Send this proposal before opening the client authorization walkthrough.